27MW: The fastest delivery at a speed of 27MW within 4 months
Maximum Supportable Computing Power
Total Capacity
Renewable Energy Reserves
TO BE THE LEADING ECOSYSTEM OF CROSSING
GREEN ENERGY AND DATA INDUSTRIES
THE INTEGRATION OF “SOURCE-GRID-LOAD-STORAGE” PRACTICE
LARGEST “SOURCE-GRID-LOAD-STORAGE” INTEGRATED DEMONSTRATION PROJECT IN THE CORE AREAS SURROUNDING BEIJING
In the Zhangjiakou area(i.e,zhangbei,guyuan,yu county), wind and solar power projects are being implemented
Plan in batches and adopt the project access scheme. Ensure the consumption of green electricity and realize the transmission to the southern area of Zhangjiakou. The outbound line is 515 kilometers long and there are 15 booster stations.
HOYNN (Huailai) Technology Industrial Campus
Deploy energy storage on the power supply side and develop shared and independent energy storage .